Service → Projects opens the Projects & Work workspace for the active business. Workspace projects follow normal access rules; Restricted projects are visible only to owners, super admins and assigned users. Connected customers, invoices and service jobs provide context without changing billing.
Before you beginConfirm the active business, project and permitted audience. Only authorized project managers should change access, public intake or notification settings. Customer tracking links and external updates can expose project information.
Step by step
- Go to Service → Projects and confirm the active business. Read Active projects, At risk, Due soon and Open work. Open work excludes Done and Cancelled items; Due soon covers the next seven days and excludes completed/cancelled projects.
- Choose an existing project from the newest-updated list or choose New project. On phone layouts, selecting a project moves from the project list into its workspace; use the back control to return.
- For a new project, enter the required Name, optional Description, Type, Health, Due date, and an assigned Location when appropriate. Types include Service, Implementation, Retainer, Digital, Marketing, Installation, Internal, and Other. New projects begin in Planned status and use the effective profile as owner/creator.
- Open Project settings to manage visibility and relationships. Owners and super admins can change Workspace versus Restricted visibility and assigned-user membership. Confirm everyone who must operate a restricted project is assigned. Choose the project location deliberately because communication delivery uses its provider settings before storefront defaults.
- Search and connect the exact customer/contact. Connected contacts provide identity context and become eligible for work-item relationships. Disconnecting a contact removes only the project link; it does not delete or edit the customer.
- Under Suggested invoices, review invoices for connected contacts and link only records that belong to this project. Linking or unlinking a contact/invoice does not change invoice status, balance, accounting sync or collection. Use Linked jobs to open related service work in its own job workspace.
- Choose Work item. Enter the required Title plus optional Description, Type, Priority, staff Assignee, Related contact, and Due date/time. Item types include Task, Service, Visit, Deliverable, Approval, Bug, Follow-up, Recurring, and Other.
- Use Board to move work among Backlog, Ready, In progress, Blocked, Review, and Done. Drag a card to the intended list and verify the updated status. Cancelled is available from item detail but is not a normal board column.
- Use Lists to rename the project board columns. The visible terminology changes, but each column keeps its stable reporting status key. Do not rename columns in a way that reverses the meaning of Backlog, Review, Done, or another reporting stage.
- Use Milestone to add a title and optional due date. The Milestones tab shows stored status and due date; the current visible screen provides creation and display, not a general milestone edit/delete workflow.
- Use List for a compact work-item view. Open an item to review item number, title, status, assignee, due time, description, checklist, approvals, and comments. Changing Status writes immediately, so verify the chosen stage before closing.
- Add checklist items as concrete completion steps. Choosing an item toggles its complete state and completion time. Checklist progress supports the work record; it does not automatically move the parent item to Done.
- Request an approval by choosing an approver and optional note. A pending approval can be Approved or Rejected from the item detail. Verify the named approver and decision because this is durable project evidence, not a private draft.
- Use Updates and choose Internal note or External update before posting. Internal notes are for the team; External updates are visible to the requester on the private tracking page. Check the audience and remove credentials, payment data and unrelated customer details before choosing Post update.
- When an authorized requester needs a tracking link, enter the correct Requester name and Requester email in Updates, then choose Tracking link. Verify the generated link and recipient through your approved delivery process. Keep private tracking links out of public screenshots and general messages.
- In Project settings, use Public ticket intake only when an authorized manager intends to expose a project-specific intake form. Create intake link or Rotate intake link generates a revocable URL, and each submitted ticket becomes a work item with its own private tracking link. Review where the intake URL will be distributed before sharing it.
- If New support ticket notifications is shown for the project, review the exact active recipient and enabled in-app, email or SMS channels. Channel availability and recipient contact details limit the choices; changing a notification setting is not proof that a future message was delivered.
- After creating, moving, linking, changing access or posting an update, reopen the project and verify the exact record and audience. Use the linked service job, customer, invoice, receipt or accounting screen to verify operational results outside the project.
Screen and contract reference
| Control or area | What it means |
|---|---|
| FolderKanban icon | Current Service → Projects navigation icon. |
| Active projects | Loaded projects whose status is Active. |
| At risk | Projects whose health is At risk or Off track. |
| Due soon | Noncompleted/noncancelled projects due within seven days. |
| Open work | Tenant work items whose status is not Done or Cancelled. |
| New project | Creates a Planned project with name, description, type, health, location, owner, and due date. |
| Workspace visibility | Project available under normal tenant access rules. |
| Restricted visibility | Visible only to owners, super admins, and assigned project members. |
| Project settings | Visibility, project location, assigned users, public intake, support alerts, connected contacts and invoice references. |
| Connected contact | Project relationship to an existing customer/contact; disconnect does not delete the contact. |
| Suggested invoices | Invoices belonging to connected contacts; linking does not change billing status. |
| Work item | Task, service, visit, deliverable, approval, bug, follow-up, recurring, or other unit of work. |
| Priority | Low, Normal, High, or Urgent item priority. |
| Team assignee | Active tenant profile responsible for the item, or Unassigned. |
| Related contact | One of the contacts already connected to the project. |
| Board | Status-based workflow view with draggable work-item cards. |
| Stable status key | Backlog, Ready, In progress, Blocked, Review, Done, or Cancelled reporting meaning retained when a list is renamed. |
| Milestones | Project checkpoints with stored title, status, and optional due date. |
| List | Compact row view of project work items. |
| Checklist | Independent completion steps; toggling one does not complete the parent automatically. |
| Approvals | Pending durable request that an approver can Approve or Reject. |
| Updates | Choose Internal note for the team or External update for the requester tracking page before posting. |
| Tracking link | Generated for the selected work item and named requester; treat the link as private. |
| Public ticket intake | Authorized project-specific intake link creation/rotation; submitted tickets become work items. |
| Support ticket notifications | Conditional recipient/channel settings; delivery requires working provider configuration. |
| Linked jobs | Opens related service jobs without changing their billing or completion state. |
Expected result
The intended project has correct access, work stages, assignees and relationships, and each note/update uses the intended internal or requester audience. Project links remain distinct from invoice/payment outcomes.
Troubleshooting
- If a project is missing, check the active business and Restricted visibility membership before creating a replacement.
- If a contact or invoice is unavailable, verify the connected customer and intended project; do not link a similar record merely to complete a form.
- If a public or private link fails, inspect its current lifecycle and request a fresh authorized link; do not edit capability tokens.
- If a notification is not delivered, check recipient/channel availability and original provider evidence before resending.
CentriPOS API explorer · API Center administration
More guides
Build an itemized payment in MoneyUse Products or Amount & description to build one receipt, attach the customer, and follow the appropriate payment or service-estimate workflow.
Take a one-time payment in Virtual TerminalReview a one-time amount, tax and contact at the correct payment station, use its verified secure checkout, and recover the original receipt after an uncertain result.
Review booking payments, refunds and earned careKeep a booking’s customer payments, unused advances, completed care, cancellation fees and refunds distinct, then read a correctly scoped accrual report.
Configure booking properties and customer pagesSet accommodations, service packages, availability, required intake and payment terms, then review the correctly branded booking page before sharing it.